Engineering Consulting Services for the Mitrovica Regional Water Company Institutional and Technical Support for the Water Supply System, Mitrovica Region (Phase II)
Population including 4 villages in the surrounding area: 321,600
Main and distribution network: 416 km
Reservoirs: 19
Pumping stations: 16
Activities Phase 1:
- Evaluation of the infrastructure of the water supply system (sewage treatment plant, pumping stations, reservoirs, gate valves)
- Water demand analysis and preview
- Hydraulic calculation and calibration, training of waterworks staff in the use of NESEI software, GIS and mapping
- Design, tendering, construction supervision for the investment measures of phase 1:
Mitrovica South: third zone, supplemented 2 DMA's
Mitrovica North: Repairing pipelines, upgrading pumping station
Skenderaj: Telemetry bulk water meter
Activities Phase 2:
- Upgrading and repair of the existing water network focuses on pumping and energy optimisation,
- Water loss reduction and the establishment of additional measuring zones (DMAs)
- Optimisation of pumping/energy efficiency