Municipal Infrastructure V in Fier, Vlora, Berat-Kucova, Lezhe, Shkodra
Activities:
- Component C: Detailed Design and Tendering
- Preparation of detailed design
- Preparation of prequalification and tender documents for:
Construction of water supply and sewerage works under FIDIC Pink Book, Construction of WWTP Fier under FIDIC Yellow Book - Assistance to PEA in tendering and contracting
- Component D: Supervision of Works and Supplies
- Supervision of construction measures
- Testing and inspection of completed works
- Taking over
Investment measures:
- Rehabilitation of water supply and distribution network
- Extension of the sewerage network in Fier and Lezhe
- Rehabilitation of pump stations; installation of a booster station
- House connections and water meters
- Construction of a WWTP including flood and erosion protection measures
- Stormwater - Disaster risk reduction in Lezhe
- Upgrade of the SCADA system
