Municipal Infrastructure I & II – Gjirokastra, Fier, Lezha, Saranda


Detailed design, preparation of tender documents, assistance in the tendering process, preparation of contracts and site supervision in four Albanian cities (Gjirokastra, Fier, Lezha, Saranda).

Activities:

  • Hydraulic calculations of the water supply system.
  • Design and tendering according to FIDIC (Red Book): operational buildings, rehabilitation and extension of the water supply network, boreholes / wellfield, new pumping stations including mechanical and electrical equipment, water storage, replacement / installation of 11,500 water meters, SCADA and telemetry system, rehabilitation of the main collector.
  • Construction supervision and acceptance.
  • Country
    Albania
  • Period
    2012 - 2017
  • Financing
    KfW - Development Bank (Germany); SECO (Switzerland) and EU
  • Consulting budget
    € 4.176.258
  • Investement budget
    € 49 Million
  • Partner
    H.P. Gauff Ingenieure-JBG (Germany), Holinger AG (Switzerland), Taulant Sh.p.k. (Albania) und Plan-Consult Sh.p.k. (Albania)
  • SETEC Engineering GmbH

  • Feldkirchner Straße 50
    9020 Klagenfurt, Austria

  • +43 463 5808-5

  • This email address is being protected from spambots. You need JavaScript enabled to view it.

SETEC Engineering provides customised solutions for public and private water utilities.